From the Community ·
Phase III: Choosing Your Finishes Before the Walls Close
Reserve with ten percent down, then sit with the builder over cabinetry, stone, flooring and light while the residence is still open enough to change.

The short answer
- Phase III residences are reserved with ten percent down.
- Selections are made with the builder directly, at builder cost.
- The window closes once drywall and cabinetry are set for that residence.
The window is real, and it closes
Phase III is the only point at which a residence is still yours to shape. Reserve the lot with ten percent down, then meet the builder for selections before construction reaches finish stage. It is the difference between choosing a home and accepting one.
Once drywall and cabinetry are set, that window has closed for that residence, and no amount of goodwill reopens it.

What is yours to choose
Cabinetry, countertops, flooring species and stain, bathroom tile and fixtures, closet build-outs, the appliance package, the lighting design, interior paint, smart-home pre-wire, and the rooftop outdoor kitchen.
Every selection is made with the builder directly, at builder cost, and documented before the work begins.
Common questions
What is Phase III at Latitudes in the Park?
Phase III is the current construction phase, in which a buyer reserves a residence with ten percent down and then selects finishes with the builder before construction reaches finish stage.
What can be customized at Latitudes in the Park?
Cabinetry, countertops, flooring, bathroom tile and fixtures, closet build-outs, appliances, lighting, interior paint, smart-home pre-wire and a rooftop outdoor kitchen, all with the builder at builder cost.
